Posts Tagged ‘air-handling unit’
Extend Economizer Operations for AHUs & Improve Ventilation with Effective Mixing
Today’s post includes a special download option to Blender Products, Inc.’s white paper, “Extend Economizer Operations for AHUs and Improve Ventilation with Effective Mixing.”
Read MoreTMI Climate Solutions Provides a Higher Level of Comfort to the DePaul Theatre School
Today’s blog post is a case study from one of our custom air-handling unit manufacturers, TMI Climate Solutions. The case study provides a detailed summary of how TMI worked with DePaul University to outfit their Theartre School with a reliable custom air-handling unit (AHU) to service the Theatre. Not only was the AHU designed to meet LEED Silver specifications, it was also customized to produce as little noise as possible, and met the snow and wind load requirements needed for Chicago rooftops…
Read MoreTMI Climate Solutions Serves Data Centers
TMI Climate Solutions is proud to serve mission critical environments such as data centers. With the ever-growing boom in information technology the need for data centers will only increase. Learn how TMI and Flow Tech can cater to this industry in today’s post…
Read MoreTime Lapse Video of TMI Custom AHU Produced from Ground Up
Take a look behind the scenes at the construction of a custom TMI air-handling unit…
Read MoreFlow Tech is Proud to Represent TMI Climate Solutions
Flow Tech is happy to announce the addition of our newest product offering. We are now a proud representative of TMI Climate Solutions!
Read MoreHPT Provides Heat Pipes to American Multinational Consumer Goods Company
Learn how our heat pipe manufacturer aided an American Multinational Consumer Goods company achieve a no-cross-contamination energy recovery environment…
Read MoreAluminum – the “Green” Metal of Air Enterprises
In today’s post you’ll discover how our air-handling unit manufacturer, Air Enterprises stays ahead of the competition with a secret weapon – aluminum…
Read MoreAir Enterprises’ SiteBilt AHU Provides Quick and Easy Installation
This is a time elapsed video of an Air Enterprises’ SiteBilt™ air-handling unit (AHU) being installed. SiteBilt™ AHUs are the ideal air-handling unit option for projects with tight deadlines and even tighter space restrictions. Flow Tech is a proud representative of Air Enterprises’ air-handling units. This specific project was located at Eastern Maine Medical Center,…
Read MoreFlow Tech Keeps Hartford Hospital’s ORs Running Safely and Efficiently
New construction is always an exciting thing. Everything in a building is brand new, never been used, and is in tip-top condition, including the HVAC and building systems. Eventually time passes and that brand new building becomes 10 years old, then 20, 30, and eventually 40+. Those once state-of-the-art and brand new building systems are now outdated, inefficient and need replacement.
Such was the case with Hartford Hospital’s Bliss Building. Built in 1970, the buildings original air-handling units had never been replaced, but were in dire need. Today’s blog features the case study about how Flow Tech was able to replace three of the hospital’s air-handling units with our disrupting their ORs…
Read MoreSiteBilt™ at One Stamford Forum
BUILDING AIR-HANDLING SYSTEMS ONSITE WITH A DEADLINE Today’s post highlights a Flow Tech case study featuring our Air Enterprises SiteBilt™custom air-handling unit (AHU) line. SiteBilt™ is a type of AHU that is built and installed onsite to combat tight space restraints and quick time frames. Learn how Flow Tech and SiteBilt™ worked with this commercial building to meet…
Read More