Posts Tagged ‘SiteBilt’
Air Enterprises’ Air Handling for Healthcare Facilities
Critical environments such as hospitals and medical facilities require the highest standards of hygiene and contamination prevention. Air Enterprises helps our healthcare clients meet and exceed these standards by providing the most hygienic, efficient air handling units for their healthcare facilities. Flow Tech is proud to represent Air Enterprises’ all-aluminum, custom-engineered air handling units. These AHUs are ideally suited for hospital environments, where corrosion and contaminated air are not acceptable…
Read MoreAir Enterprises Improves Hartford Hospital’s Emergency Room Ventilation
As with all hospitals, Hartford Hospital strives to provide only the best healthcare and service to each and every one of its patients. In order to accomplish this, it is crucial that its facilities remain in excellent working condition with optimized ventilation and airflow throughout. However, to maintain this status, any system downtime for maintenance would…
Read MoreAir Enterprises’ Air Handling for Governmental Buildings
Often times government buildings are considered historic and require special treatment when it comes to upgrades and retrofits of mechanical equipment. They cannot experience downtimes during maintenance or installation. Air Enterprises custom air handling units combat both of these issues. Today’s post discusses why they provide the perfect air handling solution of governmental buildings…
Read MoreAir-hanlding Unit Solution for Little Time & Less Space: SiteBilt Time Lapse Video
Today’s post provides details about Air Enterprises’ SiteBilt custom air-handling units and how they are perfect for retrofit or replacements with tight space and time restrictions…
Read MoreAluminum – the “Green” Metal of Air Enterprises
In today’s post you’ll discover how our air-handling unit manufacturer, Air Enterprises stays ahead of the competition with a secret weapon – aluminum…
Read MoreFlow Tech Keeps Hartford Hospital’s ORs Running Safely and Efficiently
New construction is always an exciting thing. Everything in a building is brand new, never been used, and is in tip-top condition, including the HVAC and building systems. Eventually time passes and that brand new building becomes 10 years old, then 20, 30, and eventually 40+. Those once state-of-the-art and brand new building systems are now outdated, inefficient and need replacement.
Such was the case with Hartford Hospital’s Bliss Building. Built in 1970, the buildings original air-handling units had never been replaced, but were in dire need. Today’s blog features the case study about how Flow Tech was able to replace three of the hospital’s air-handling units with our disrupting their ORs…
Read MoreSiteBilt™ at One Stamford Forum
BUILDING AIR-HANDLING SYSTEMS ONSITE WITH A DEADLINE Today’s post highlights a Flow Tech case study featuring our Air Enterprises SiteBilt™custom air-handling unit (AHU) line. SiteBilt™ is a type of AHU that is built and installed onsite to combat tight space restraints and quick time frames. Learn how Flow Tech and SiteBilt™ worked with this commercial building to meet…
Read MoreFlow Tech Enhances UConn Health Center’s Main “L” Building Efficiency
AHU Solutions for Major Renovation Project Many don’t realize, but when a major renovations or expansion project occurs, every aspect of the building needs to be considered for updates. A facility’s heating, cooling and ventilation system is no exception. Such was the case with UConn Health Center’s “L” Building. The following blog post is a…
Read MoreSiteBilt™ at 920 Broad Street − Building Custom Air-handling Units Onsite
A new construction project is always an exciting thing. Involvement from the beginning is crucial, especially when there’s potential to bid for multiple product lines. Today’s post isn’t about working on a new project however, instead we’re going to discuss replacement and retrofit projects. When the average person hears “construction” they automatically think of big,…
Read MoreSiteBilt Custom Air-handling Unit Built in 2 Days and Passed Through a 3’ Door
SiteBilt air-handling units, manufactured by Air Enterprises and supplied by Flow Tech, Inc. can be installed almost anywhere and in a very short amount of time. Watch as an old AHU is torn out and a new SiteBilt custom AHU is built on site in less than 2 days! (Source: https://www.youtube.com/) Nichole PetersenNichole joined Flow…
Read More